![]() ![]() Required wire gauge and fuse sizing is found on page 8 of the MultiPlus user manual.Ģ. ![]() particularly given that the Multi can pull far more current than that wire can carry, which means you have a recipe for melted wiring and possible fire on your hands. Currently I don't actually see a fuse(?) protecting the wiring feeding the Multi, which if true is a critical error that must be immediately corrected prior to powering this system up. If you've fused your 1/0 cable appropriately to its maximum ampacity (285A, so fused at ~250A) then your circuit is adequately protected, but you'll definitely blow the fuse under heavy load, so better to correct that now. The MultiPlus should be connected to your battery bank with 4/0 cable and fused at 400A - this because the 12v Multi 3kVA can pull upwards of 380A under surge conditions. Go Power! TS-30 30 Amp Automatic Transfer Switch (likely to be deleted) MPPT Controllers Multiplus-II BMV Battery I'll mention a couple of things that strike me:ġ. Victron SmartSolar Charge Controller (150V 45A Tr)Ĭurrent Surge Limiter (CSL for short) ( ) Is there any reason I should still include the Go Power automatic transfer switch when I re-run the shore power? I'm re-running a completely new lead & replacing the inlet, so it would be a convenient time to remove the transfer switch if it is unnecessary.ĩ60W renogy panels, 6 x 160W each hooked up in Series-parallel configuration (two sets of 3 panels in series, then paralleled into the MPPT)Ĩ00 Ah BattleBorn batteries, 8 x 100 Ah each
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |